@@ Article 18. Contracts for construction projects must be
concluded in accordance with procedures prescribed by the state and
investment plans, planned project descriptions and other documents
approved by the state.
In contracting for construction projects, including survey,
design, building and installation, one general contractor may
sign a general contract with the construction client, or
several contractors may separately sign contracts with the
construction client.
Survey and design contracts shall provide the time for delivery
of the basic survey or design data and design documents (including
an estimated budget) by both parties, the quality requirements of
the design, other conditions for coordination and other similar
provisions.
Building and installation contracts shall expressly provide the
scope of the project, the construction work period, the time for
beginning and completing intermediate construction projects, the
quality of the work, the costs of construction, the time for
delivery of technical data, the responsibilities for the supply of
materials and equipment, the allocations of funds and settlement of
accounts, the inspection and acceptance of the projects upon
completion, the mutual cooperation by the parties and other similar
terms.
The inspection and acceptance of construction projects upon
completion shall be carried out according to the blueprints and
written instructions, and to the work testing norms and quality
inspection standards issued by the state.
@@ Article 19. Processing contracts shall be concluded on the basis
of the ordering party's requirements as to the description of goods,
the items and quality, and of the contractor's capacity to
process, make to order or repair. Except as otherwise provided in
the contract, the contractor must use its own equipment, technology
and labour force to complete the principal part of the tasks
of processing, making to order and repairing and may not, without the
consent of the ordering party, assign the accepted tasks to a third
party. The ordering party shall accept the products and articles
completed by the contractor and shall pay remuneration therefor.
The contractor shall promptly inspect the raw and processed
materials supplied by the ordering party and, if it discovers
that they do not conform to the stipulations of the contract, it
shall immediately notify the ordering party to replace them or
supply what is lacking. The contractor may not, without
permission, replace any raw and processed materials supplied by
the ordering party and may not covertly exchange components of
articles being repaired, and violators shall be liable for making
compensation.